Risks embedded in the system:
- There are tasks that require a competency possessed by only one performer.
- There are tasks that require a competency for review possessed by only one performer.
- There are tasks for which there is no executor for execution
- There are tasks for the execution of which there is no reviewer available
The expected time estimate for this task is greater than the threshold of 16 hours.
If the task is part of the project, it is a medium risk.
If the task is on the critical path, it is a high risk.
The task has high uncertainty (the maximum to minimum estimate ratio is greater than the threshold of 16 hours).
If the task is part of the project, it is a medium risk.
If the task is on the critical path, it is a high risk.