A Task is a specific scope of technical work that must be completed to achieve the goal of a business objective. Typically, an Objective is decomposed into multiple tasks. Each technical task involves one executor and one specific skill.
This is the basis of the auto-assignment principle, and the quality control processes are also skill-based. Each competency has an established quality control process with its stages. A combination of multiple technical Tasks results in fulfilling the business Objective.
Tasks move to stages only if the following conditions are met:
- The task has defined competencies and estimates.
- The Iteration is defined.
User actions:
- Creating a task (title, description, estimated time for implementation, defining the necessary competency - skill and level of mastery of that skill) at any time.
-
Editing task data:
- Title and description - can be edited at any time.
- Required competency:
✅ The task did not go through the DOING and REVIEW stages.
✅ The task is at the TO DO stage, and the assignee has not been appointed yet.
✅The task is at the DOING stage or has already passed this stage - Сhanging the competence may lead to a change in the workflow - the task is moved to a new workflow.
Changing the performer: the performer is notified about being removed from the task.
Changing the stage: if the task is at the Doing stage, then when changing the competence, it is returned to the To Do stage.
❌ Changing the competence is impossible for a task at the REVIEW stage or if it has already passed the stages.
❌ Changing the competence is impossible for a DONE stage task.
-
- Time estimation for implementation:
✅ Time estimation can be done for tasks at the TO DO, DOING, and REVIEW stages.
❌ Changing the time estimation for implementation is impossible for a task at the DONE stage.
- Moving a task to another Objective
- Manual assignment of executor
- Completion of work on a task at any stage of the workflow
- Creating/modifying dependencies between tasks can be done at any time.
- Deletion is possible if:
- Does not have any input/output dependencies.
- The task does not have an assigned executor
Input/output dependencies between tasks:
A task can be linked to other tasks through input/output dependencies (sequence of execution) or be an autonomous element of the decomposition of one Objective. When creating an incoming dependency, the system blocks the task.
In the Task card, where an incoming dependency is created, i.e., whose execution is only possible after the completion of work on the predecessor tech task, the symbol appears in the Blocked field, informing the user that the system is blocking the execution of this tech task for the performer. As soon as the predecessor tech task is completed (workflow DONE stage), i.e., passes all stages of the Workflow process from assigning the performer by the system to their execution and quality review by the reviewer, this tech task will be unblocked, and the symbol
in the Blocked field will inform the user about it.